I took this job after the first installer was fired.
There were lots of problems. The durock had to come down so the walls could be shimmed plumb and straight. There was no moisture
membrane behind the durock either, so that was installed. The cement Pan was "ok" except the slope was inadequate.
The finished product was delightful; a 2 stall shower with glass block enclosure. Wow! The designer deserves some accolades.
|
| An outside wall with no moisture barrier...Oh Boy |
|
|
| This would have rotted out in just a year or two |
| The stall is done here, and easier to see |
|
|
| before the Glass Brick goes up |
| Closeup of the "Listello", cut and set by hand |
|
|
| as individual pieces |
|
| This outside wall is plaster, with holes |
|
|
| and cellulose. Again, sure to rot in no time at all |
| Note the built-in shelf above the shower control |
|
|
| One of the shower stations |
|
|
|
| |
|
| |
|
| |
|
| |
|
| |
|
| |
|
|